SIRS reserve study in Palm Beach County

In unincorporated Palm Beach County, distance from the coast decides when a building's first milestone inspection falls. Coastal buildings meet it at 25 years, five years before inland ones, and that inspection shapes the SIRS that follows.

Local programs change; confirm with the county or city.

Get a quote

The coastal line

The county building division sets the first inspection at 25 years within three miles of a coastline and 30 years beyond it, repeating every 10 years (Palm Beach County PZB, mandatory milestone inspections). Reports go in on form EB18-2024 through the county portal, one building and one report type per submission. Cities such as Boca Raton and West Palm Beach handle their own buildings.

Where the SIRS picks up

Salt air is hard on exactly the items the SIRS lists: concrete and rebar (b), balcony waterproofing (f) and window and door hardware (g). A provider working near the ocean should shorten remaining-life estimates accordingly, and the board should expect higher annual figures for those lines than an inland building of the same age.

If a phase two report has come back, repairs must start within 365 days. Price those repairs into the SIRS so the funding plan and the repair schedule tell the same story.

The state rule, unchanged by county

Whatever the local program, the SIRS itself is state law. Every condo or co-op building of three habitable stories or more in Palm Beach County needs one at least every 10 years, covering the eight statute items, signed by one of the four credentials, with reserves that owners cannot waive. The deadlines page has the dates.

Other counties

Miami-Dade, Broward, Pinellas, Sarasota, Collier, Lee, Duval.

Sources

Get a quote

Three short screens. The building first, then you, then the job.

For
Condo and co-op boards and managers in Florida
Buildings
Three habitable stories or more
Cost to the board
Nothing for the introduction

We are an introduction service, not a SIRS provider. We choose one firm that prepares structural integrity reserve studies in your area, tell you its name, and send your request only after you say yes.