Who may perform and sign a SIRS

Paragraph (g)3.a lists the professionals who may perform or verify a SIRS. The choice among them is the board's, and it is worth making on purpose rather than by habit.

Fla. Stat. 718.112(2)(g)3

Get a quote

The four credentials

ProfessionalLicensed or certified byStrength
Professional engineerLicensed under Florida Statutes chapter 471The usual choice where structure, balconies or a garage deck are the worry.
Registered architectLicensed under chapter 481Common on envelope work: windows, doors, waterproofing and roofs.
Reserve Specialist (RS)Certified by the Community Associations InstituteA reserve analyst credential, strong on costing and the funding plan.
Professional Reserve Analyst (PRA)Certified by the Association of Professional Reserve AnalystsThe other reserve analyst credential the statute names.

The wording is "performed or verified", so a study can be prepared by a team and verified by one of these four. Many Florida firms pair a reserve analyst who builds the cost model with an engineer who signs off the structural judgment. Ask who will visit the building, who will sign, and under which credential.

Matching the signer to the building

A low-rise garden-style condo with a sound frame and a roof coming due needs good costing more than structural depth. A 1980s tower with spalling balconies and a phase two milestone finding needs an engineer's eye on items b and f. Three questions sort most cases:

  1. Has a milestone or county inspection found substantial structural deterioration? If so, favor an engineer.
  2. Is the hard part the envelope, meaning roof, windows and waterproofing? An architect or an engineer with envelope experience fits.
  3. Is the hard part the money, meaning a thin reserve and a large backlog? A credentialed reserve analyst with an engineer verifying is a common answer.

The conflict rule

Paragraph (g)3.b covers firms that might want the repair work as well as the study. A design professional or licensed contractor bidding for the SIRS must tell the association in writing if it intends to bid on any maintenance, repair or replacement the study may recommend. A firm bidding on recommended work may not have an interest in the firm that did the study, directly or through a close relative, unless that is disclosed in writing.

If the disclosure is missing, the services contract is voidable and ends when the association files a written notice, and the professional may face discipline under its practice act. Ask every bidder to put its answer on the proposal.

Firms that list SIRS work in Florida

These firms say on their own websites that they prepare structural integrity reserve studies in Florida. We list what each site states and nothing more; no firm pays to appear here, and being listed is not a recommendation.

FirmBasedCredentials stated
Alliance Reserve ServicesReserve studies, SIRSOrlandoNot stated
Beryl Engineering & InspectionSIRS, milestone inspections, reserve studiesTampaPE
Criterium-Cromer EngineersSIRS, reserve and transition studiesMiamiPE
FPAT (Felten Property Assessment Team)Reserve studies, SIRS, insurance appraisalsSafety HarborCAI and APRA member
J. R. FrazerReserve studies, SIRS, insurance valuationsWellingtonNot stated
m2e Consulting EngineersSIRS, milestone inspectionsCoral GablesPE
Souffront Construction & EngineeringSIRS, milestone inspectionsSunriseNot stated
Stone Building SolutionsReserve studies, SIRS, milestone inspectionsCoral Gables and St. PetersburgNot stated
Structural Integrity EngineersSIRS, milestone inspectionsTampa, Naples, Fort Myers, Miami, OrlandoNot stated
Team CompleteSIRS, milestone inspectionsPensacola and MiamiPE
KipconReserve studies, SIRS, transition studiesKissimmee officeRS, PE
Global Solution PartnersReserve studies, SIRS, insurance appraisalsNational, Florida pageRS, PE
Reserve AdvisorsReserve studies, SIRS, insurance appraisalsNational (Milwaukee)Not stated
Reserve Data AnalysisReserve studies, SIRSNationalNot stated
The Falcon GroupReserve studies, SIRS, transition studiesNational (Warren, NJ)RS, PRA

"Not stated" means the website was silent on it, which is different from the firm lacking it. Confirm a license on the Florida DBPR lookup before signing.

Sources

Get a quote

Three short screens. The building first, then you, then the job.

For
Condo and co-op boards and managers in Florida
Buildings
Three habitable stories or more
Cost to the board
Nothing for the introduction

We are an introduction service, not a SIRS provider. We choose one firm that prepares structural integrity reserve studies in your area, tell you its name, and send your request only after you say yes.

Step 1 of 3

The building

Habitable stories in the tallest building

Buildings of three stories or more

Get a quote